Drag Link Conveyor Installation, Glasgow

Project Overview

Dynamo Engineering are pleased to announce the successful completion of works on an existing material handling system, consisting of the reconfiguration of a pneumatic conveyor, drop link conveyor and the installation of a new tubular drag conveyor, for a large activated carbon manufacture in Glasgow

Main Contractor: Emtech Systems Ltd

Mechanical Contractor: Dynamo Engineering Ltd

Process flow changes had to be undertaken to allow trials to be carried out on a new product. The current kiln feed and discharge Redler en-masse and dynamic air pneumatic conveyor system had to be reconfigured and a new Spiroflow link and pin, tubular drag conveyor was to be installed. Modifications to existing access platforms and stairways also had to be made to accommodate the new position of the kiln feed conveyor.

Project Description